As a Seattle deck builder, our Olympic Decks team replaced a rotted 408-square-foot wood deck at an association’s front entrance. The project included AZEK Vintage PVC decking in English Walnut, two staircases, cable railing, step lights, and Grade #1 pressure-treated lumber. Our four-person crew completed the work in one week, adapting the replacement to an existing design dating from 1973.

Project Snapshot
| Detail | Project Information |
| Location | Seattle, WA |
| Project type | Wood-to-PVC deck replacement |
| Size | 408 sq. ft. |
| Previous condition | Rotted wood deck |
| Decking | AZEK Vintage PVC |
| Finish | English Walnut |
| Features | Two staircases, cable railing, step lights |
| Lumber | Grade #1 pressure-treated lumber |
| Timeline | One week |
| Crew | Four people |
The Challenge
Wood rot had affected the community’s front-entry deck, which required replacement. Working with the existing structure’s 1973 design also presented a challenge: updating the entrance while keeping the new construction close to the association’s vision.
According to the association’s project manager, our crew marked off the work area and cleaned the site before leaving each day.
The Association’s Goals
The association wanted to replace the deteriorated decking with AZEK Vintage PVC and have the finished deck reflect its vision for the shared entrance.
Homeowners comparing deck resurfacing with a full replacement can review our deck replacement and resurfacing guide.
Decking Materials and Installation
We installed AZEK Vintage PVC decking in English Walnut across the deck’s walking surface and two staircases, along with cable railing and step lights. Our crew also used Grade #1 pressure-treated lumber in the deck construction.
We offer new deck design and installation for Seattle homeowners and associations planning a similar deck project. Our team can help you choose materials, railings, stairs, and lighting to suit your outdoor space.
Deck Construction Timeline
Our four-person crew completed this Seattle deck construction project in one week.
The Association’s Review of Our Deck Services
The association’s project manager said the final result exceeded expectations and praised our team’s communication, detailed estimate, careful workmanship, daily cleanup, and attention to safety. The review also recognized our efforts to address the challenges of the 1973 design.
FAQs
Why did the association replace its front-entry deck?
The existing wood deck had developed rot at the association’s front entrance. We replaced the deteriorated deck with AZEK Vintage PVC decking as part of an entrance upgrade that included two staircases, cable railing, and step lights.
Which decking material and color were used?
We installed AZEK Vintage PVC decking in English Walnut and used Grade #1 pressure-treated lumber in the construction. The project also included new railing with cable infill and step lights at the stairs.
What was the size and scope of this Seattle project?
The deck measured 408 square feet. Our work included replacing the wood decking and updating two staircases, railings, and lighting while working with an existing design dating from 1973.
How long did the deck replacement take?
Our four-person crew completed the project in one week.
Discuss Your Seattle Project with Our Deck Builders
Looking for a contractor for your deck replacement in the Seattle area? Contact our team to discuss your existing deck, material preferences, and project scope. We can help you plan the next steps and provide an estimate.