Our team replaced the rotted decking on a 180-square-foot second-story entrance deck in Bellevue, WA, with TimberTech Advanced PVC decking from the AZEK Vintage Collection. We retained the original wooden railings to preserve the character of the residential association’s 1973 deck design. Our three-person crew completed the walking surface and step upgrade in one week.

Project Snapshot
| Project Detail | Information |
| Location | Bellevue, WA |
| Project Type | Second-story front-entry deck replacement |
| Size | 180 square feet |
| Challenge | Rotted wood decking and an older deck design |
| Solution | Wood-to-PVC decking upgrade |
| Material | AZEK Vintage TimberTech Advanced PVC |
| Existing Feature | Original wood railing retained |
| Timeline | One week |
| Crew | Three professionals |
| Result | Low-maintenance entrance deck with an updated wood look |
The Challenge: Updating a 1973 Deck Design
The association’s original wood decking had developed rot and needed replacement. However, the project was not a simple board-for-board installation. The deck was built to a 1973 design, and the association wanted to retain its original wooden railing. Preserving that feature helped maintain the style of the shared entrance.
Olympic Decks needed to work through these limitations while bringing the new decking up to code and keeping the completed design aligned with the client’s expectations.
The Association’s Goals for a Low-Maintenance Entrance Deck
The association wanted to:
- Replace the rotted traditional wood surface;
- Upgrade to premium, low-maintenance decking;
- Preserve the original wood railing;
- Maintain the character of the existing entrance;
- Improve the appearance and value of the shared outdoor space.
The Solution: TimberTech Advanced PVC Decking
We replaced the deteriorated walking surface and steps with TimberTech Advanced PVC decking from the AZEK Vintage Collection. It requires no sanding, staining, or sealing. The Vintage Collection provides a realistic wood look and a distinctive wire-brushed finish.
Because Advanced PVC decking resists moisture and rot, it was a practical material choice for the shared entrance. We adapted the installation around the retained railing and discussed each challenge with the association’s project manager before proceeding.
TimberTech Decking and Retained Wood Railings
| Material | Use | Reason Selected |
| AZEK Vintage Advanced PVC decking | Entrance deck surface and steps | Low maintenance, moisture resistance, and real-wood aesthetics |
| Original wooden railing | Retained around the deck | Preserved the character of the 1973 design |
Our Installation Process
Our three-person crew completed the installation in one week. We fitted the new AZEK Vintage boards around the existing deck design and retained the original railing. The scope focused on replacing the deteriorated walking surface and steps, rather than a full replacement of every deck component.
If you are considering a similar surface upgrade, our deck resurfacing service starts with an assessment of the existing framing to determine whether it can support new decking and what repairs are needed.
The association specifically noted the team’s communication, attention to detail, and commitment to a high-end finish. At the end of each workday, the area was cleaned and visibly marked to help protect residents using the community entrance.
Before and After: An Updated Wood Look
Before the project, the association had a rotted wood walking surface that required replacement. After installation, the TimberTech decking gave the entrance an updated look while the retained wooden railing preserved a familiar feature of the original design.
According to the association’s project manager, the completed deck enhanced the value and appearance of the properties’ shared front entrance.
Customer Review
“We are very pleased with the final product! I would not hesitate for a moment to recommend Olympic Decks.”
The project manager also praised the professional estimate, transparent communication, careful construction, daily cleanup, and attention given to the association’s original deck design.
Frequently Asked Questions
What material was used for this deck replacement?
We installed TimberTech Advanced PVC decking from the AZEK Vintage Collection on the entrance deck and steps.
Were the original railings replaced?
No. The original wooden railing was retained as part of the association’s design requirements.
How long did the project take?
A three-person team completed the deck replacement in one week.
Why was the wood decking replaced?
The existing decking had developed rot. The association selected low-maintenance Advanced PVC as its new decking material.
Planning a Deck Replacement in Bellevue?
Planning a deck replacement for your Bellevue home or residential association? Schedule a free consultation with Olympic Decks. We can check the existing structure, discuss which materials may suit your entrance or outdoor living space, and help you choose a color and finish that complement the property.
Before you select a contractor, get a clear breakdown of the proposed work. Ask which components can remain, whether repairs are needed, and how materials and labor affect the cost. Our deck planning and installation process explains what to expect from the initial consultation through construction and the final walkthrough.